Hello

 

You can maintain all the components on the same BOM as alternative items.

 

Please take a look on the following link for more details about this functionality:

 

Alternative Items in an Alternative Item Group - BOMs (PP-BD-BOM) - SAP Library

 

The information below provided on this link explains how can you use this functionality:

 

You can use alternative items in the following situations:

  • Alternative items with a usage probability

The alternative items are included with a certain usage probability.

    • Material requirements planning (MRP) uses the usage probability to determine dependent requirements for the materials.
    • In the production order, dependent requirements are converted to a reservation.

The withdrawal posting for the reservation in the production order uses either the usage probability or the 100% availability check according to ATP logic.

  • Alternative items for information

You can enter an alternative item for information only. For example, the item is only relevant to missing parts. The usage probability for the item is 0&.

 

BR

Caetano